Driverless
trains are on the way.
Following the link on the TfL’s webpage leads to a file that states that they don’t expect to have the Piccadilly running at the projected increased capacity until 2025, the Central until 2030, the W&C by 2032 and the Bakerloo by 2033. Whether this means that the Lines will not be fully automated until those dates is unclear but one would assume that once the last manned trains were retired reaching the required capacity would follow soon after. Regardless that will still leave the Jubilee, Northern, Victoria and four Sub Surface Lines running in ATO with a TOp in the cab which Mike Brown estimated as 70% of trains.
So if the Central Line will not be fully NoPO until 2030 then I will be 69, retired to the North Norfolk coast with a Staffy keeping me active, Unkle Bob will be the same age on a beach in Brazil, Boris will be 64 sitting on the back benches wondering where it all went wrong while Richard Tracey will be 87 and dribbling into his porridge.
Following the link on the TfL’s webpage leads to a file that states that they don’t expect to have the Piccadilly running at the projected increased capacity until 2025, the Central until 2030, the W&C by 2032 and the Bakerloo by 2033. Whether this means that the Lines will not be fully automated until those dates is unclear but one would assume that once the last manned trains were retired reaching the required capacity would follow soon after. Regardless that will still leave the Jubilee, Northern, Victoria and four Sub Surface Lines running in ATO with a TOp in the cab which Mike Brown estimated as 70% of trains.
So if the Central Line will not be fully NoPO until 2030 then I will be 69, retired to the North Norfolk coast with a Staffy keeping me active, Unkle Bob will be the same age on a beach in Brazil, Boris will be 64 sitting on the back benches wondering where it all went wrong while Richard Tracey will be 87 and dribbling into his porridge.